N. 1st Street W. Reconstruction - 2021

The removal of approximately 3,600 s.y. of existing pavement, 3,150 s.y. of Full Depth Reclamation w/ Cement (FDR), 255 tons of crushed surfacing base course, 640 tons of Cl. ½” PG64H-28 hot mix asphalt, 460 l.f. of new curb, 350 s.y. of replacement sidewalks and driveways, and 6 handicap ramps. Also included is 320 l.f. of electrical conduit trench, catch basin modifications, tree removal, sod repair, striping, and various other items of work and incidentals.

Status

Accepting Bids

Bid Date6/24/21 2:00 pm

Company & Contacts

E&H Engineering

Thomas Haggarty enheng@msn.com   (509) 744-0245

Location

Chewelah, WA

Project Estimate: $285k

Bidders may download electronic files at no cost. Printed documents are available, at Bidder’s expense, by choosing the “Order” option.