Weber Road and Galbreath Way

This project will provide the full depth reclamation of the existing roadways with cement treated base and 5 inches of HMA surfacing, as well as the following: Removal and replacement of approximately 100 LF of storm piping; Installation of 2 type 1 catch basins and 1 type 2 grate inlet; Installation of approximately 90 SY of cement concrete driveway and 145 SY of sidewalk.

Status

Accepting Bids

Bid Date5/14/21 1:00 pm

Company & Contacts

Varela Engineering & Management

Vitaliy Chekulayev - vchekulayev@varela-engr.com   (509) 328-6066

Location

Ritzville

Documents

Project Estimate:$627,457

Bidders may download electronic files at no cost. Printed documents are available, at Bidders expense, by choosing the “Order” option.

To Bid the project, Bidder shall have purchased a full set of the CONTRACT DOCUMENTS and shall be on the plan holders list. CONTRACT DOCUMENTS may be purchased at www.varelaplanroom.com under “Public Jobs” for a nonrefundable cost of $30.